From:Changzhou Taixu Auto Parts Co., LTD. Release time:2019-09-17 14:18
What problems should be paid attention to in the production of wire harness technology?
The second station after the wire harness is opened is the crimping process. During the manufacturing process, the crimping parameters are effectively determined according to the type of the terminal required by the drawing, and the crimping operation manual is prepared. Special requirements are required to indicate and train operators on the process documentation.
In order to improve the assembly efficiency during the use of the wire harness, the complicated wire harness must be equipped with a pre-installation station. If the pre-installed part of the assembly is less or the path of the assembled wire is unreasonable, the total assembly will be increased. The workload of the staff.
The final step of wire harness processing is its assembly process. During the operation, it will be effective according to the design of the product development part of the assembly platen tooling equipment, material box size and the number of all assembly sheaths and accessories On the material box to improve assembly efficiency.